Thermal oil heater in high temperature operation state, how to deal with a sudden power failure correctly?

FAQ

In the high temperature operation state of the thermal oil heater, if encounter the emergency of power failure, its correct handling method is:

When the circulating oil pump can not run normally due to power failure, the thermal oil in the furnace tube will exceed the allowable value in a short period of time due to the residual heat in the furnace chamber. At this time, the cold oil switching valve should be opened and the cold oil in the expansion tank should be released. And send it to the oil storage tank. At the same time need wet coal pressurization or emergency stop, need to be completed within 5 minutes.

Another thing to note is not to drain the oil in the expansion tank clean, otherwise the system will draw in air and cause problems. You can make oil level mark on the oil level of the storage tank. When replacing the cold oil, the valve can be closed in time to avoid the expansion tank and the oil storage tank from expanding.

2 TPH Gas Fired Steam Boiler in Distillery

Fuel type: Gas Capacity: 2 ton Industry: Brewing Industry Equipment: NWNS2-1.0-...

15 TPH Tri-drum Water Tube Biomass Steam Boiler for Food Processing Industry

Fuel type: Biomass Capacity: 15 ton Industry: Food Industry Equipment: DZL15-1....

46 MW Hot Water Boiler for Central Heating

Project Boiler Medium:Steam Capacity: 46 MW Available Industries: Central Heatin...

15 ton SZL Series Chain Grate Steam Boiler Project

Project Boiler Medium:Steam Capacity: 15 tph Available Industries: Feed Industr...

15 Ton Superheated Steam Boiler in Paper Mill

This case is a 15 ton superheated steam boiler. The end user is a paper mill in China. ...

6tph SZL Packaged Chain Grate Steam Boiler In Bangladesh

Project boiler medium:Steam Capacity:6 tph Location:Bangladesh Equipment:SZ...

Please feel free to fill in the following form or email us (zhulin@zozen.com) to get product information,price,service and other supports.We will reply to you within 24 hours as soon as possible.Thank You!

Name *
Country
Email *
Tel
Boiler type:
Fuel:
Pressure :

Message